Installation
2AR-FE CHARGING: GENERATOR: INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator with the 2 bolts.
Torque : 52 Nm (530 kgf-cm, 38 ft-lbf)
(b) Install the wire harness clamp bracket with the bolt.
Torque : 8.4 Nm (86 kgf-cm, 74 in-lbf)
(c) Connect the generator wire with the nut.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(d) Install the terminal cap.
(e) Connect the generator connector.
2. INSTALL V-RIBBED BELT
(a) Install the belt Installation.
3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY Installation
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL