KE7 - Check IAC Circuit For Short to Ground
- Key Off.
- Breakout box installed, PCM disconnected.
- IAC solenoid disconnected.
- Measure resistance between Test Pin 83 (IAC) and Test Pins 51 and 103 (PWR GND) at the breakout box.
- Is each resistance greater than 10,000 ohms?
YES -- GO to KE8. KE8 - Check IAC Signal From PCM
NO -- SERVICE short circuit. RECONNECT all components. Rerun quick test. Diagnostic Subroutines (DSR) - Extracting Codes