Installation
METER: COMBINATION METER: INSTALLATION
INSTALLATION
1. INSTALL COMBINATION METER ASSEMBLY
(a) Connect the connector.
(b) Install the combination meter with the 4 screws.
2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
(a) Apply protective tape to the area shown in the illustration.
(b) Connect the connector.
(c) Attach the 2 clips to install the finish panel.
(d) Install the 2 clips.
3. INSTALL WINDSHIELD WIPER SWITCH ASSEMBLY Installation
4. INSTALL STEERING COLUMN COVER (w/o Driver Monitor Camera) Installation
5. INSTALL STEERING COLUMN COVER (w/ Driver Monitor Camera) Installation
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTE: Reset the AUTO TILT AWAY function setting to the previous condition by changing the customize parameter Repair Instruction - Customize Parameters.
7. INSTALL COWL TOP VENTILATOR LOUVER RH Installation
8. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.