Connector Block To Air Conditioning Compressor (AC) Line
Operation number: 87465-2
Connector Block to Air Conditioning Compressor (AC) Line
Note! Some variation in the illustrations may occur, but the essential information is always correct.
Removal
Note! Removal steps in this procedure may contain installation details.
Drain the refrigerant from the AC-system. Refer to: Refrigerant, draining Refrigerant, Draining
Torque: M6, 10 Nm
Torque: M8, 24 Nm
Installation
To install, reverse the removal procedure.
Vacuum-pump the AC-system. Refer to: Vacuum pumping Vacuum Pumping
Fill the AC-system with refrigerant. Refer to: Refrigerant, filling Refrigerant, Filling
Check the AC-system for leaks with tracer/UV-light. Refer to: Leak detection, tracer agent Leak Detection, Tracer Agent
Or with electronic leak detector.
Carry out a performance test on the climate control system. Refer to: Climate control system, check Climate Control System, Check