FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation (from 07/2011)





U340E AUTOMATIC TRANSMISSION / TRANSAXLE: TRANSMISSION CONTROL CABLE (for Hatchback): INSTALLATION

1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY

(a) Connect the transmission control cable assembly to the control shaft lever with the nut.





Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)

Text in Illustration





(b) Install the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.

NOTICE:
Make sure that the marking on the cable is aligned with the slit in the No. 1 transmission control cable bracket before installing the cable.

(c) Install the transmission control cable assembly to the control cable support.

(d) Install the transmission control cable assembly with the 3 nuts.

Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)

2. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR

(a) Install the front No. 1 floor heat insulator with the 2 bolts and nut.

Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)

3. INSTALL FRONT EXHAUST PIPE ASSEMBLY

Installation (from 07/2011)

4. INSTALL AIR CLEANER BRACKET Installation (from 07/2011)

5. INSTALL AIR CLEANER ASSEMBLY Installation (from 07/2011)

6. INSTALL BATTERY CARRIER Installation (from 07/2011)

7. INSTALL BATTERY TRAY

8. INSTALL BATTERY Installation (from 07/2011)

9. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY Installation (from 07/2011)

10. ADJUST SHIFT LEVER POSITION Adjustments

11. INSPECT SHIFT LEVER POSITION Initial Inspection and Diagnostic Overview

12. INSTALL REAR CONSOLE BOX ASSEMBLY

Installation (from 07/2011)