FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





2AR-FE INTAKE / EXHAUST: INTAKE MANIFOLD: INSTALLATION

1. INSTALL INTAKE AIR CONTROL VALVE ACTUATOR (for TCV) Installation

2. INSTALL PURGE LINE HOSE

(a) Install the purge line hose to the intake manifold.

(b) Connect the purge line hose to the clamp.

3. INSTALL CHECK VALVE

(a) Install the 2 vacuum hoses to the check valve.

(b) Connect the 2 vacuum hoses to the intake manifold to install the check valve.





(c) Check that the check valve is installed as shown in the illustration.

Text in Illustration





4. INSTALL INTAKE MANIFOLD





(a) Close the tumble control valves.

Text in Illustration





NOTICE:
The valves may be damaged if they are not closed before installing the intake manifold.

HINT
Connect the battery to the terminals of the actuator and operate the motor to close the valves Intake System.





(b) Install a new gasket to the intake manifold.





(c) Install the intake manifold with the 6 bolts and tighten the bolts in the sequence shown in the illustration.

Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)

5. CONNECT NO. 2 PCV HOSE

(a) Connect the No. 2 PCV hose to the intake manifold.

6. CONNECT WIRE HARNESS

(a) Attach the clamp and connect the wire harness.

(b) Install the bracket with the bolt.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(c) Connect the intake air control actuator connector.

(d) Install the wire harness clamp bracket with the 2 bolts.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(e) Attach the 2 clamps.

(f) Connect the 2 hoses and connector and attach the clamp to the vacuum switching valve.

7. CONNECT HEATER HOSE

(a) Connect the outlet heater water hose to the heater radiator unit.

(b) Connect the inlet heater water hose to the heater radiator unit.

8. INSTALL HOSE TO HOSE TUBE

(a) Install the tube with the 2 nuts.

Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)

(b) Connect the 2 hoses.

9. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY Installation

10. INSTALL ENGINE UNDER COVER Installation

11. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY

Installation

12. ADD ENGINE COOLANT Service and Repair

13. INSPECT FOR COOLANT LEAK Testing and Inspection