FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





2AZ-FE CHARGING: GENERATOR: INSTALLATION

1. INSTALL GENERATOR ASSEMBLY

(a) Install the wire harness clamp bracket with the bolt.





Torque : 8.4 Nm (86 kgf-cm, 74 in-lbf)

(b) Install the generator assembly with the 2 bolts.





Bolt A - Torque : 21 Nm (215 kgf-cm, 16 ft-lbf)

Bolt B - Torque : 52 Nm (530 kgf-cm, 38 ft-lbf)

(c) Install the generator wire to terminal B with the nut.





Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)

(d) Attach the clamp and connect the generator connector to the generator.

(e) Install the 2 wire harness clamps.

2. INSTALL FAN & GENERATOR V BELT Installation

3. INSTALL REAR ENGINE UNDER COVER RH

4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque : 5.4 Nm (55 kgf-cm, 47 in-lbf)