Installation
2ZR-FE EMISSION CONTROL: PCV VALVE: INSTALLATION
INSTALLATION
1. INSTALL VENTILATION VALVE SUB-ASSEMBLY
(a) Apply adhesive to 2 or 3 threads of the ventilation valve.
Adhesive:
Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
(b) Install the ventilation valve.
Torque: 20 Nm (204 kgf-cm, 15 ft-lbf)
(c) Connect the ventilation hose.
2. INSTALL INTAKE MANIFOLD Installation
3. INSTALL ENGINE OIL LEVEL DIPSTICK
4. INSTALL TRANSMISSION OIL LEVEL GAUGE SUB-ASSEMBLY (for Automatic Transaxle) Installation
5. INSTALL OIL COOLER TUBE (for Automatic Transaxle) Installation
6. INSTALL STARTER ASSEMBLY
7. INSTALL INJECTOR VIBRATION INSULATOR Installation
8. INSTALL NO. 1 DELIVERY PIPE SPACER Installation
9. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY Installation
10. CONNECT FUEL TUBE SUB-ASSEMBLY Installation
11. INSTALL FUEL PIPE CLAMP Installation
12. CONNECT VACUUM HOSE Installation
13. CONNECT NO. 1 FUEL VAPOR FEED HOSE Installation
14. INSTALL HARNESS BRACKET Installation
15. INSTALL ENGINE WIRE HARNESS Installation
16. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH HOSE Installation
17. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 Nm (55 kgf-cm, 48 in-lbf)
18. ADD ENGINE COOLANT Service and Repair
19. INSPECT FOR COOLANT LEAK Testing and Inspection
20. INSPECT FOR FUEL LEAK
Vehicle Damage Warnings
21. INSTALL NO. 2 CYLINDER HEAD COVER Installation
22. INSTALL ENGINE UNDER COVER RH
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
23. INSTALL ENGINE UNDER COVER LH
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)