Installation
2ZR-FE INTAKE: INTAKE MANIFOLD: INSTALLATION
INSTALLATION
1. INSTALL INTAKE MANIFOLD
(a) Install a new gasket onto the intake manifold.
(b) Install the intake manifold and intake manifold stay with the 4bolts and 2 nuts.
Torque: 28 Nm (286 kgf-cm, 21 ft-lbf)
(c) Connect the ventilation hose.
(d) Connect the 4 wire harness clamps.
2. INSTALL THROTTLE BODY ASSEMBLY Installation
3. INSTALL TRANSMISSION OIL LEVEL GAUGE SUB-ASSEMBLY
(a) Install the transmission oil level gauge sub-assembly with the bolt.
Torque: 5.5 Nm (56 kgf-cm, 49 in-lbf)
(b) Connect the breather hose.
(c) Install the transmission oil level dipstick.
4. INSTALL OIL COOLER TUBE
(a) Install the oil cooler tube clamp.
(1) Provisionally install the outlet No. 1 oil cooler tube into the oil cooler tube union.
(2) Provisionally install the inlet No. 1 oil cooler tube into the oil cooler tube union.
(3) Install the No. 2 oil cooler tube clamp onto the transmission oil filler tube sub-assembly with the bolt.
Torque: 5.5 Nm (56 kgf-cm, 49 in-lbf)
(b) Using a union nut wrench, install the outlet No. 1 oil cooler tube while holding the oil cooler tube union with a spanner.
without union nut wrench - Torque: 34 Nm (347 kgf-cm, 25 ft-lbf)
with union nut wrench - Torque: 32 Nm (327 kgf-cm, 24 ft-lbf)
NOTE:
- This torque value can be obtained by using a torque wrench with a fulcrum length of 345 mm (13.58 in.) and a union nut wrench with a fulcrum length of 30 mm (1.18 in.).
- This torque value is effective when the union nut wrench is parallel to the torque wrench.
(c) Using a union nut wrench, install the inlet No. 1 oil cooler tube while holding the oil cooler tube union with a spanner.
without union nut wrench - Torque: 34 Nm (347 kgf-cm, 25 ft-lbf)
with union nut wrench - Torque: 32 Nm (327 kgf-cm, 24 ft-lbf)
NOTE:
- This torque value can be obtained by using a torque wrench with a fulcrum length of 345 mm (13.58 in.) and a union nut wrench with a fulcrum length of 30 mm (1.18 in.).
- This torque value is effective when the union nut wrench is parallel to the torque wrench.
5. INSTALL ENGINE OIL LEVEL DIPSTICK
6. INSTALL STARTER ASSEMBLY
7. INSTALL INJECTOR VIBRATION INSULATOR Installation
8. INSTALL NO. 1 DELIVERY PIPE SPACER Installation
9. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY Installation
10. CONNECT FUEL TUBE SUB-ASSEMBLY Installation
11. INSTALL FUEL PIPE CLAMP Installation
12. CONNECT VACUUM HOSE Installation
13. CONNECT NO. 1 FUEL VAPOR FEED HOSE Installation
14. INSTALL HARNESS BRACKET Installation
15. INSTALL ENGINE WIRE HARNESS Installation
16. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH HOSE Installation
17. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 Nm (55 kgf-cm, 48 in-lbf)
18. ADD ENGINE COOLANT Service and Repair
19. INSPECT FOR COOLANT LEAK Testing and Inspection
20. INSPECT FOR FUEL LEAK
Vehicle Damage Warnings
21. INSTALL NO. 2 CYLINDER HEAD COVER Installation
22. INSTALL ENGINE UNDER COVER RH
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
23. INSTALL ENGINE UNDER COVER LH
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)