Installation
2ZR-FE ENGINE CONTROL SYSTEM: KNOCK SENSOR: INSTALLATION
INSTALLATION
1. INSTALL KNOCK SENSOR
(a) Install the knock sensor with the bolt as shown in the illustration.
Torque: 21 Nm (214 kgf-cm, 16 ft-lbf)
(b) Connect the knock sensor connector.
2. INSTALL INTAKE MANIFOLD
(a) Install a new gasket onto the intake manifold.
(b) Install the intake manifold and intake manifold stay with the 4 bolts and 2 nuts.
Torque: 28 Nm (286 kgf-cm, 21 ft-lbf)
(c) Connect the water by-pass hose and the No. 2 water by-pass hose.
(d) Connect the throttle body assembly connector.
(e) Connect the ventilation hose.
(f) Connect the 4 wire harness clamps.
3. INSTALL TRANSMISSION OIL LEVEL GAUGE SUB-ASSEMBLY (for Automatic Transaxle) Installation
4. INSTALL OIL COOLER TUBE (for Automatic Transaxle) Installation
5. INSTALL ENGINE OIL LEVEL DIPSTICK
6. INSTALL STARTER ASSEMBLY
7. INSTALL INJECTOR VIBRATION INSULATOR Installation
8. INSTALL NO. 1 DELIVERY PIPE SPACER Installation
9. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY Installation
10. CONNECT FUEL TUBE SUB-ASSEMBLY Installation
11. INSTALL FUEL PIPE CLAMP Installation
12. CONNECT VACUUM HOSE Installation
13. CONNECT NO. 1 FUEL VAPOR FEED HOSE Installation
14. INSTALL HARNESS BRACKET Installation
15. INSTALL ENGINE WIRE HARNESS Installation
16. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH HOSE Installation
17. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 Nm (55 kgf-cm, 48 in-lbf)
18. ADD ENGINE COOLANT Service and Repair
19. INSPECT FOR COOLANT LEAK Testing and Inspection
20. INSPECT FOR FUEL LEAK
Vehicle Damage Warnings
21. INSTALL NO. 2 CYLINDER HEAD COVER Installation
22. INSTALL ENGINE UNDER COVER RH
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
23. INSTALL ENGINE UNDER COVER LH
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)