VPWR3 - VPWR Wire From Main Relay to PCM
- Key OFF.
- Install Breakout Box (leave PCM disconnected).
- Remove the main relay.
- Measure the resistance of the VPWR wire between BOB Test Pin VPWR and the VPWR terminal on the main relay harness connector in the main fuse panel.
- Is the resistance less than 5 ohms?
Yes -- Go to VPWR4. VPWR4 - Ground at Main Relay
No -- Service the VPWR wire.