Installation
1UR-FSE LUBRICATION: OIL PUMP (for 2WD): INSTALLATION
1. INSTALL WATER INLET PIPE
(a) Apply soapy water to 2 new O-rings and install them to the inlet pipe.
(b) Install the inlet pipe to the No. 1 heat exchanger cover.
2. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY
(a) Install a new oil pump gasket.
(b) Install a new O-ring.
(c) Apply seal packing in a continuous line to the timing chain cover as shown in the following illustration.
Seal packing:
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
*
Apply seal packing as follows:
NOTICE:
* When the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.
* Install the chain cover within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
* Do not start the engine for at least 2 hours after installing.
(d) Align the spline of the oil pump's drive rotor and the crankshaft as shown in the illustration. Install the spline and chain cover to the crankshaft.
(e) Temporarily install the 30 bolts and nut.
Bolt length:
NOTICE:
Make sure that there is no oil on the bolt threads.
(f) Tighten the 11 bolts in several steps, in the sequence shown in the illustration.
Torque : 47 Nm (479 kgf-cm, 35 ft-lbf)
(g) Temporarily install the belt tensioner with the standard bolt and 6 mm hexagon wrench bolt.
(h) Tighten the 21 bolts and nut in several steps, in the sequence shown in the illustration.
Torque : 23 Nm (235 kgf-cm, 17 ft-lbf)
NOTICE:
After the installation, if the seal packing has seeped out at the areas labeled A shown in the illustration, wipe it off.
(i) Install 2 new gaskets and 2 plugs.
Torque : 46 Nm (469 kgf-cm, 34 ft-lbf)
3. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY (for Bank 1)
(a) Install 4 new gaskets and 2 new O-rings to the camshaft bearing caps (No. 2, No. 3, No. 7).
(b) Install a new gasket to the cylinder head cover.
NOTICE:
Remove any oil from the contact surface.
(c) Apply seal packing as shown in the illustration.
Seal packing:
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
NOTICE:
* Remove any oil from the contact surface.
* Install the cylinder head cover within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
* Do not start the engine for at least 2 hours after the installation.
(d) Install the cylinder head cover with 2 new seal washers and the 15 bolts.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf) for bolt A
Torque : 12 Nm (122 kgf-cm, 9 ft-lbf) for except bolt A
4. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY (for Bank 2)
(a) Install 4 new gaskets and 2 new O-rings to the camshaft bearing caps. (No. 1, No. 3, No. 6).
(b) Install a new gasket to the cylinder head cover.
NOTICE:
Remove any oil from the contact surface.
(c) Apply seal packing as shown in the illustration.
Seal packing:
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
NOTICE:
* Remove any oil from the contact surface.
* Install the cylinder head cover within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
* Do not start the engine for at least 2 hours after the installation.
(d) Install the cylinder head cover with 2 new seal washers and the 15 bolts.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf) for bolt A
Torque : 12 Nm (122 kgf-cm, 9 ft-lbf) for except bolt A
5. INSTALL IGNITION COIL ASSEMBLY Installation
6. INSTALL CRANKSHAFT PULLEY
(a) Align the pulley set key with the key groove of the pulley, and slide on the pulley.
(b) Using SST, install the pulley bolt.
SST : 09213-54015
90119-08216
SST : 09330-00021
Torque : 300 Nm (3059 kgf-cm, 221 ft-lbf)
7. INSTALL RESONATOR BRACKET SUB-ASSEMBLY Replacement
8. INSTALL OIL FILTER BRACKET
(a) Install 2 new gaskets and the filter bracket with the 3 bolts.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
9. INSTALL OIL FILTER ELEMENT Replacement
10. INSTALL CAMSHAFT TIMING CONTROL MOTOR ASSEMBLY (for Bank 1) Installation
11. INSTALL CAMSHAFT TIMING CONTROL MOTOR ASSEMBLY (for Bank 2) Installation
12. INSTALL FRONT WATER BY-PASS JOINT Reassembly
13. INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY Installation
14. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY Installation
15. INSTALL WATER PUMP PULLEY Installation
16. INSTALL WATER INLET HOUSING
(a) Install the inlet housing and a new gasket with the 3 bolts.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(b) Using needle-nose pliers, grip the claws of the clips and slide the clips to connect the water by-pass hoses and water inlet hose.
17. INSTALL FUEL PUMP ASSEMBLY (for High Pressure) Installation
18. INSTALL NO. 2 FUEL PIPE SUB-ASSEMBLY Installation
19. INSTALL NO. 3 FUEL PIPE SUB-ASSEMBLY Installation
20. INSTALL FUEL PRESSURE PULSATION DAMPER ASSEMBLY Installation
21. INSTALL ENGINE COVER SUB-ASSEMBLY Installation
22. INSTALL NO. 3 ENGINE COVER Installation
23. INSTALL INTAKE MANIFOLD Installation
24. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY Installation
25. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
26. INSTALL INJECTOR DRIVER Installation
27. INSTALL GENERATOR ASSEMBLY Installation
28. INSTALL OIL LEVEL DIPSTICK GUIDE Installation
29. CONNECT COOLER COMPRESSOR ASSEMBLY Installation
30. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY (for Bank 1) Installation
31. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR Installation
32. INSTALL NO. 2 STEERING INTERMEDIATE SHAFT ASSEMBLY (w/ VGRS) Installation
33. INSTALL NO. 2 STEERING INTERMEDIATE SHAFT ASSEMBLY (w/o VGRS) Installation
34. INSTALL STEERING SLIDING YOKE WITH SHAFT SUB-ASSEMBLY (w/ VGRS) Installation
35. INSTALL STEERING SLIDING YOKE WITH SHAFT SUB-ASSEMBLY (w/o VGRS) Installation
36. INSTALL FRONT SUSPENSION MEMBER REINFORCEMENT LH Installation
37. CONNECT FRONT STABILIZER BAR Installation
38. INSTALL FRONT EXHAUST PIPE ASSEMBLY
(a) Install the front exhaust pipe Installation.
39. CONNECT ENGINE WIRE
(a) Connect the engine wire with the 4 nuts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the clamp and install the 2 clamp brackets with the 2 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(c) Connect the intake air control valve actuator connector.
(d) Connect the purge VSV connector.
(e) Connect the 4 injector driver connectors as shown in the illustration.
(f) Connect the ground wire with the bolt.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(g) for Engine Room RH Side:
(1) Connect the 2 clamps and Install the 3 clamp brackets with the 3 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(2) Connect the engine oil level sensor connector.
(3) Connect the crankshaft position sensor connector.
(4) Connect the starter connector and starter wire with the nut.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(5) Connect the generator connector and generator wire with the nut.
Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)
(6) Connect the camshaft position sensor connector.
(7) Connect the engine wire connector.
(8) Connect the 2 camshaft timing control motor connectors (for Bank 2).
Connect the fuel pump connector (for high pressure).
Connect the 2 VVT sensor connectors.
(11) Connect the 4 ignition coil connectors.
(12) Connect the camshaft timing control valve connector.
(13) Connect the wires with No. 1 engine room junction block with the 2 nuts.
Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)
(14) Connect the 3 connectors with front controller with the clamp.
(h) for Engine Room LH Side:
(1) Install the clamp bracket with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(2) Connect the 3 clamps and 3 ground wires with the 3 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(3) Attach the clamp and connect the cooler compressor connector.
(4) Connect the 2 camshaft timing control motor connectors (for Bank 1).
(5) Connect the engine oil pressure sensor connector.
(6) Connect the engine coolant temperature sensor connector.
(7) Connect the clamp and install the 2 clamp brackets with the 2 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(8) Connect the No. 8 engine wire connector.
Connect the fuel pump connector (for high pressure).
Connect the 2 VVT sensor connectors.
(11) Connect the 4 ignition coil connectors.
(12) Connect the camshaft timing control valve connector.
(13) Connect the 3 ECT connectors and 4 ECM connectors.
(14) Install the ECM box cover (upper).
40. INSTALL ENGINE ROOM ECU OUTLET DUCT Installation
41. INSTALL SKID CONTROL ECU BRACKET Installation
42. INSTALL SKID CONTROL ECU Installation
43. CONNECT NO. 2 RADIATOR HOSE
44. CONNECT NO. 1 RADIATOR HOSE
45. INSTALL V-RIBBED BELT Installation
46. INSTALL RADIATOR RESERVOIR ASSEMBLY Installation
47. INSTALL AIR CLEANER ASSEMBLY LH Installation
48. INSTALL AIR CLEANER ASSEMBLY RH Installation
49. INSTALL INTAKE AIR CONNECTOR PIPE Installation
50. INSTALL NO. 1 AIR CLEANER INLET Installation
51. INSTALL ENGINE UNDER COVER REAR LH Installation
52. INSTALL ENGINE UNDER COVER REAR RH Installation
53. INSTALL BATTERY TRAY
(a) Install the battery tray with the 3 bolts.
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
(b) Install the battery and battery insulator.
54. INSTALL BATTERY CLAMP SUB-ASSEMBLY
(a) Install the battery clamp and 2 clamp bolts with the nut.
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
55. ADD ENGINE OIL Replacement
56. ADD ENGINE COOLANT Service and Repair
57. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
58. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
59. INSPECT FOR OIL LEAK
(a) Inspect for engine oil leak Installation.
60. INSPECT FOR COOLANT LEAK Component Tests and General Diagnostics
61. INSPECT FOR FUEL LEAK Fuel System
62. INSPECT FOR EXHAUST GAS LEAK Installation
63. CHECK ENGINE OIL LEVEL Testing and Inspection
64. INSTALL FRONT SUSPENSION MEMBER PROTECTOR LOWER Installation
65. INSTALL NO. 2 ENGINE UNDER COVER Installation
66. INSTALL NO. 1 ENGINE UNDER COVER Service and Repair
67. INSTALL ENGINE ROOM SIDE COVER RH Installation
68. INSTALL ENGINE ROOM SIDE COVER LH Installation
69. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY Installation
70. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
71. INSTALL COWL TOP VENTILATOR LOUVER RH Installation