Installation
AIR CONDITIONING: COMPRESSOR (for AWD): INSTALLATION
1. ADJUST COMPRESSOR OIL
(a) When replacing the compressor and magnetic clutch with a new one, gradually discharge the refrigerant gas from the service valve, and drain the following amount of oil from the new compressor and magnetic clutch before installation.
Standard:
(Oil capacity inside the new compressor and magnetic clutch: 130 + 15 cc (4.6 + 0.51 fl.oz.) ) - (Remaining oil amount in the removed compressor and magnetic clutch) = (Oil amount to be removed from the new compressor when replacing)
NOTICE:
* When checking the compressor oil level, observe the A/C system's precautions.
* If a new compressor and magnetic clutch is installed without removing some oil remaining in the pipes of the vehicle, the oil amount will be too large. This prevents heat exchange in the refrigerant cycle and causes refrigerant failure.
* If the volume of oil remaining in the removed compressor and magnetic clutch is too small, check for oil leakage.
* Be sure to use ND-OIL 8 or equivalent for compressor oil.
2. INSTALL COOLER COMPRESSOR WITH PULLEY
(a) Connect the cooler compressor with the 2 stud bolts, 2 nuts and 2 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf) for stud bolts
Torque : 25 Nm (255 kgf-cm, 18 ft-lbf) for nuts
Torque : 25 Nm (255 kgf-cm, 18 ft-lbf) for bolts
(b) Connect the connector.
3. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH Installation
4. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR Installation
5. INSTALL ENGINE AND TRANSMISSION
(a) Install the engine and transmission Installation.