Installation
2GR-FSE ENGINE CONTROL SYSTEM: KNOCK SENSOR: INSTALLATION
1. INSTALL KNOCK SENSOR
(a) Install the 2 knock sensors so that they are horizontal as shown in the illustration. Then install the 2 bolts.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
HINT
It is acceptable for the sensor to be tilted +10° to -5°.
(b) Connect the 2 knock sensor connectors.
2. INSTALL FUEL INJECTOR SEAL Installation
3. INSTALL INJECTOR Installation
4. INSTALL NO. 1 FUEL DELIVERY PIPE Installation
5. INSTALL NO. 2 FUEL DELIVERY PIPE Installation
6. INSTALL NO. 3 FUEL PIPE Installation
7. INSTALL NO. 2 FUEL PIPE Installation
8. INSTALL FUEL PUMP ASSEMBLY Installation
9. CONNECT NO. 2 FUEL PIPE Installation
10. INSTALL NO. 1 FUEL PIPE Installation
11. INSTALL FUEL PRESSURE PULSATION DAMPER Installation
12. INSTALL WATER HOSE JOINT Installation
13. INSTALL INTAKE MANIFOLD Installation
14. INSTALL INTAKE AIR SURGE TANK ASSEMBLY Installation
15. INSTALL THROTTLE BODY Installation
16. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE Installation
17. CONNECT NO. 2 VENTILATION HOSE Installation
18. ADD ENGINE COOLANT Testing and Inspection
19. INSPECT FOR COOLANT LEAK Testing and Inspection
20. INSPECT FOR FUEL LEAK Testing and Inspection
21. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY Installation
22. INSTALL WINDSHIELD WIPER ARM AND BLADE ASSEMBLY LH Installation
23. INSTALL WINDSHIELD WIPER ARM AND BLADE ASSEMBLY RH Installation
24. INSTALL FRONT WIPER ARM HEAD CAP Installation
25. INSTALL ROOF DRIP SIDE FINISH MOULDING LH
26. INSTALL ROOF DRIP SIDE FINISH MOULDING RH
27. INSTALL FRONT FENDER PROTECTOR UPPER LH Installation
28. INSTALL FRONT FENDER PROTECTOR UPPER RH Installation
29. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
30. INSTALL ENGINE ROOM SIDE COVER LH Installation
31. INSTALL ENGINE ROOM SIDE COVER RH Installation
32. INSTALL COOL AIR INTAKE DUCT SEAL Installation
33. CHECK FUNCTION THROTTLE BODY Inspection