Swirl Valve Linkage - Installation
INSTALLATION
1. Install the round clips (2) into the swirl valve linkage.
2. Clean the intake manifold sealing surfaces.
3. Install new intake manifold gaskets.
4. Install the EGR cooler.
5. Position the intake manifold and tighten to 20.34 N.m (180 lbs. in.)
6. Install the throttle control assembly.
7. Instal the glow plug module.
8. Install the coolant hose at the thermostat housing.
9. Install the EGR control assembly.
10. Install the EGR control assembly chamber retaining bolts.
11. Install the EGR control assembly retaining bracket.
12. Install the swirl valve actuator.Swirl Valve Actuator - Installation.
13. Install the fuel filter assembly Fuel Filter - Installation.
14. Install the fuel lines.Fuel Tube(s) - Installation
15. Position and connect the engine harness.
16. Install the front lifting bracket.
17. Install rear lifting bracket.
18. Install the EGR tube.
19. Install the turbocharger.Turbocharger - Installation
20. Install the engine compartment lower silencer.
21. Fill the cooling system.Service and Repair
22. Install the vapor control valve.
23. Instal the charge air outlet tube (4).
24. Install the charge air resonator.
25. Install the air cleaner assembly.Air Cleaner Body - Installation.
26. Install the engine cover..
27. Connect the batteries..