Integrated Center Stack Screen Module - Installation
INSTALLATION
1. Position the (ICS) screen module (2) into the bezel and install the retainers (1).
2. Connect the harness connectors (2 & 3) to the rear of the Integrated Center Stack (ICS) screen module (1).
NOTE: In the event that the locking tab breaks or is broken, do not replace the harness. The connector will still lock and the harness will still function as designed.
3. Carefully connect the 40 - way connector (1).
4. Install the instrument cluster center bezel (2) Instrument Panel Center Bezel - Installation.
5. Connect the negative battery cable.