Thermostatic Expansion Valve to Connector Block Line
Thermostatic Expansion Valve to Connector Block Line
Operation number: 87457-2
Note! Some variation in the illustrations may occur, but the essential information is always correct.
Removal
Drain the refrigerant from the AC system. Refer to: Refrigerant, draining Refrigerant, Draining
Lift aside the expansion tank.
Remove the upper engine stabilizer brace. Refer to: Upper torque rod, B6304T2 Upper Torque Rod
Raise the servo reservoir. Refer to: Reservoir fluid power steering Service and Repair
1. Torque: Clips refrigerant pipe to bodywork, 6 Nm
2. Torque: M8, 24 Nm
Remove the panel. Refer to: Secondary Bulkhead Panel RH Service and Repair
1. Remove the plastic nuts.
2. Torque: M6, 10 Nm
1. Remove the connector.
2. Torque: M6, 10 Nm
Installation
Change and lubricate the O-rings with compressor oil.
To install, reverse the removal procedure.
Vacuum-pump the AC-system. Refer to: Vacuum pumping Vacuum Pumping
Fill the air conditioning system with refrigerant. Refer to: Refrigerant, filling Refrigerant, Filling
Leak-trace the air conditioning system. Refer to: Leak detection, tracer agent Leak Detection, Tracer Agent
Or: Refer to: Leak tracing, electronic leak tracer Leak Tracing, Electronic Leak Tracer
Carry out a performance test on the climate control system. Refer to: Climate control system, check Climate Control System, Check