Installation (to 12/2010)
2GR-FE STARTING: STARTER: INSTALLATION
1. INSTALL STARTER ASSEMBLY
(a) Install the starter assembly with the 2 bolts.
Torque : 37 Nm (380 kgf-cm, 26 ft-lbf)
(b) Connect the wire harness to terminal 30 and install the nut.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(c) Cover the nut with the cap.
(d) Connect terminal 50 to the starter assembly.
2. INSTALL AIR CLEANER INLET NO.1 Installation (to 12/2010)
3. INSTALL AIR CLEANER ASSEMBLY WITH HOSE Installation (to 12/2010)
4. CONNECT BATTERY NEGATIVE TERMINAL
5. PERFORM INITIALIZATION
HINT
Repair Instruction - Initialization
(a) Some systems need initialization when disconnecting the battery terminal.