Installation (from 12/2010)
2GR-FE CHARGING: GENERATOR: INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
(a) Install the bracket with the bolt.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
(b) Install the wire harness clamp stay.
Torque : 8.4 Nm (86 kgf-cm, 74 in-lbf)
(c) Install the generator assembly with the 2 bolts.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
(d) Install the nut to the cylinder block.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
(e) Connect the generator connector to the generator assembly.
(f) Install the generator wire with the nut.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(g) Install the terminal cap.
(h) Connect the wire harness clamp.
2. INSTALL V-RIBBED BELT Installation (from 12/2010)
3. INSTALL V-BANK COVER SUB-ASSEMBLY Installation (from 12/2010)
4. CONNECT BATTERY NEGATIVE TERMINAL
5. PERFORM INITIALIZATION
HINT
Repair Instruction - Initialization
(a) Some systems need initialization when disconnecting the battery terminal.