Installation
2GR-FE COOLING: THERMOSTAT: INSTALLATION
1. INSTALL THERMOSTAT
(a) Install a new gasket to the thermostat.
(b) Install the thermostat with the jiggle valve facing up.
HINT
The jiggle valve may be set within 10°of either side of the prescribed position.
2. INSTALL WATER INLET
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
3. INSTALL RADIATOR HOSE OUTLET
4. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
5. INSTALL FAN & GENERATOR V BELT
6. INSTALL ENGINE MOUNTING BRACKET FRONT NO.1 LH
7. INSTALL ENGINE MOUNTING CONTROL BRACKET
8. INSTALL ENGINE MOVING CONTROL ROD
9. INSTALL V-BANK COVER SUB-ASSEMBLY
10. ADD ENGINE COOLANT
11. INSPECT FOR COOLANT LEAK