FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





2ZR-FE ENGINE MECHANICAL: CYLINDER HEAD GASKET: INSTALLATION

1. INSTALL CYLINDER HEAD GASKET

(a) Place a new gasket on the cylinder block surface with the Lot No. stamp facing upward.





NOTICE:
* Remove any oil from the contact surface.
* Make sure that the gasket is installed in the correct direction.
2. INSTALL CYLINDER HEAD SUB-ASSEMBLY

HINT
The cylinder head bolts are tightened in 2 progressive steps.

(a) Apply a light coat of engine oil to the bolt threads and the area beneath the bolt heads that come in contact with the washers.

(b) Install the bolts and plate washers to the cylinder head.

NOTICE:
Do not drop the washers into the cylinder head.

(c) Using several steps, uniformly install and tighten the 10 cylinder head bolts and 10 plate washers with a 10 mm bi-hexagon wrench in the order shown in the illustration.





Torque : 49 Nm (500 kgf-cm, 36 ft-lbf)

(d) Mark the front side of the cylinder head bolts with paint.





(e) Retighten the cylinder head bolts an additional 90°, then once more 45° as shown in the illustration.

(f) Check that the paint mark is now at a 135° angle to the front.

3. INSTALL VALVE LASH ADJUSTER ASSEMBLY Reassembly

4. INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY Reassembly

5. INSTALL NO. 1 CAMSHAFT BEARING Installation

6. INSTALL NO. 2 CAMSHAFT BEARING Installation

7. INSTALL NO. 2 CAMSHAFT Installation

8. INSTALL CAMSHAFT Installation

9. INSTALL CAMSHAFT BEARING CAP Installation

10. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY Installation

11. INSTALL CAMSHAFT TIMING GEAR ASSEMBLY Installation

12. INSTALL CAMSHAFT TIMING EXHAUST GEAR ASSEMBLY Installation

13. INSTALL NO. 1 CHAIN VIBRATION DAMPER

(a) Install the No. 1 chain vibration damper with the 2 bolts.





Torque : 21 Nm (214 kgf-cm, 16 ft-lbf)

14. INSTALL NO. 2 CHAIN VIBRATION DAMPER Installation

15. INSTALL CHAIN SUB-ASSEMBLY

(a) Check the No. 1 cylinder TDC/compression.

(1) Temporarily tighten the crankshaft pulley bolt.

(2) Turn the crankshaft counterclockwise to position the timing gear key to the top.





(3) Remove the crankshaft pulley bolt.

(4) Check the timing marks on each camshaft timing gear.





(b) Align the mark plate (orange) with the timing mark of the No. 2 camshaft as shown in the illustration and install the chain.





HINT
* Be sure to position the mark plate at the front of the engine.
* The mark plate on the camshaft side is colored orange.
* Do not pass the chain around the sprocket of the camshaft timing gear assembly. Only place it on the sprocket.
* Pass the chain through the No. 1 vibration damper.
(c) Place the chain on the crankshaft without passing it around the shaft.





(d) Hold the hexagonal portion of the camshaft with a wrench and turn the camshaft timing gear assembly counterclockwise to align the mark plate (orange) and timing mark.





HINT
* Be sure to position the mark plate at the front of the engine.
* The mark plate on the camshaft side is colored orange.
(e) Hold the hexagonal portion of the camshaft with a wrench and turn the camshaft timing gear assembly clockwise.

HINT
To tension the chain, slowly turn the camshaft timing gear assembly clockwise to prevent the chain from being misaligned.

(f) Align the mark plate (yellow) and timing mark and install the chain to the crankshaft timing gear.





HINT
The mark plate on the crankshaft side is colored yellow.

(g) Recheck each timing mark at TDC/compression.





16. INSTALL CHAIN TENSIONER SLIPPER

(a) Install the chain tensioner slipper.





17. INSTALL TIMING CHAIN COVER OIL SEAL Reassembly

18. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY Installation

19. INSTALL CRANKSHAFT PULLEY Installation

20. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY Reassembly

21. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY Reassembly

22. INSTALL RADIO SETTING CONDENSER Installation

23. INSTALL THERMOSTAT Installation

24. INSTALL INLET WATER Installation

25. INSTALL INLET WATER HOSE Installation

26. INSTALL WATER BY-PASS HOSE Installation

27. INSTALL NO. 1 WATER BY-PASS PIPE Installation

28. CONNECT NO. 3 WATER BY-PASS HOSE Installation

29. INSTALL VENTILATION HOSE Installation

30. INSPECT EXHAUST MANIFOLD Engine Unit

31. INSTALL EXHAUST MANIFOLD Installation

32. INSTALL MANIFOLD STAY Installation

33. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR Installation

34. INSTALL OIL LEVEL DIPSTICK SUB-ASSEMBLY Installation

35. INSTALL IGNITION COIL ASSEMBLY Installation

36. INSTALL FUEL INJECTOR ASSEMBLY Installation

37. INSTALL NO. 1 DELIVERY PIPE SPACER Installation

38. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY Installation

39. INSTALL FUEL TUBE SUB-ASSEMBLY Installation

40. INSTALL INTAKE MANIFOLD Installation

41. REMOVE ENGINE STAND Installation

42. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE

HINT
Installation.