Canister Purge Solenoid: Testing and Inspection
VSV FOR EVAP INSPECTION1. REMOVE V-BANK COVER AND EMISSION CONTROL VALVE SET AND HIGH-TENSION CORD COVER.
2. REMOVE VSV.
- Disconnect the 2 EVAP hoses from the VSV.
- Remove the screw and VSV.
3. INSPECT VSV FOR OPEN CIRCUIT.
- Using an ohmmeter, check that there is continuity between the terminals.
Resistance At 20°C (68°F): 27 - 33 Ohms
- If there is no continuity, replace the VSV.
4. INSPECT VSV FOR GROUND
- Using an ohmmeter, check that there is no continuity between each terminal and the body.
- If there is continuity, replace the VSV.
5. INSPECT VSV OPERATION.
- Check that air flows with difficulty from port E to port F.
- Apply battery positive voltage across the terminals.
- Check that air flows from port E to port F.
- If operation is not as specified, replace the VSV.
6. REINSTALL VSV.
- Install the VSV with the screw.
- Connect the 2 EVAP hoses to the VSV.
7. REINSTALL EMISSION CONTROL VALVE SET.
8. REINSTALL HIGH-TENSION CORD COVER.
9. REINSTALL V-BANK COVER.