Intake Manifold Removal and Installation
Intake Manifold Removal and Installation
Throttle Body and Intake Manifold Components
Removal
1) Disconnect negative (-) cable at battery.
2) Remove engine cover.
3) Remove throttle body assembly. Throttle Body Assembly Removal and Installation
4) Remove engine cover bolt (1).
5) Disconnect the following connectors and hoses.
- EVAP canister purge valve connector (2)
- Brake booster hose (3)
- PCV valve hose (4)
- Purge hose (5)
- IMT valve actuator connector (6)
- IMT valve actuator clamp (7)
- Engine harness bracket (8)
- Engine harness clamp (Intake manifold lower side) (9)
6) Remove intake manifold (1) and gasket (2) from cylinder head.
Installation
Reverse removal procedure for installation noting the following points:
- Use New gaskets
- The Intake manifold bolt No.1 (1) is not reusable so use a new one.
- Refill cooling system. Cooling System Refilling
- Check for coolant leaks. Initial Inspection and Diagnostic Overview