Installation
E351 MANUAL TRANSAXLE: SHIFT LEVER ASSEMBLY: INSTALLATION
INSTALLATION
1. INSTALL SHIFT LEVER ASSEMBLY
(a) Install the shift lever assembly with the 4 bolts.
Torque: 12 Nm (122 kgf-cm, 9 ft-lbf)
2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
(a) Connect the control cable to the shift lever retainer.
NOTICE:
- The projecting part of the cable outer should face outside when the shift cable is connected.
- After installation, make sure that the cable outer lock is projecting from A as shown in the illustration.
(b) Install the control select cable to the shift lever assembly.
(c) Install the control shift cable to the shift lever assembly.
3. ADJUST TRANSMISSION CONTROL SELECT CABLE Adjustments
4. INSTALL INSTRUMENT PANEL FINISH LOWER PANEL Installation
5. INSTALL FRONT NO. 2 CONSOLE BOX INSERT Installation
6. INSTALL FRONT NO. 1 CONSOLE BOX INSERT Installation
7. INSTALL INSTRUMENT CLUSTER FINISH CENTER LOWER PANEL Installation
8. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY Installation