Installation
2AZ-FE ENGINE CONTROL SYSTEM: ECM: INSTALLATION
INSTALLATION
1. INSTALL ECM
(a) Install the bracket onto the ECM with the 4 screws.
(b) Install the ECM with the 2 bolts.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(c) Connect the 2 ECM connectors.
(d) Install the 2 lock knobs and harness clamp.
(e) Install the wire harness clamp.
2. INSTALL AIR CLEANER ASSEMBLY
(a) Install the air cleaner case sub-assembly with the 3 bolts
Torque: 7.0 Nm (71 kgf-cm, 62 in-lbf)
(b) Install the wire harness.
(c) Install the air cleaner filter element sub-assembly.
(d) Install and lock the air cleaner cap sub-assembly and air cleaner hose and then tighten the No. 1 air cleaner hose clamp.
(e) Connect the mass air flow meter connector.
(f) Install the wire harness.