FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation








2AZ-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION

INSTALLATION





1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY
(a) Install the No. 1 vacuum switching valve assembly onto the No. 1 air cleaner hose.
(b) Connect the No. 2 fuel vapor feed hose.
(c) Connect the No. 1 fuel vapor feed hose.
(d) Install the wire harness clamp.
(e) Connect the No. 1 vacuum switching valve connector.