Installation
2AZ-FE STARTING: STARTER: INSTALLATION
2AZ-FE STARTING: STARTER: INSTALLATION
1. INSTALL STARTER ASSEMBLY
(a) Install the starter with the 2 bolts.
Torque: 37 Nm (380 kgf-cm, 27 ft-lbf)
(b) Connect the starter wire with the nut.
Torque: 9.8 Nm (100 kgf-cm, 7 ft-lbf)
(c) Cover the terminal cap.
(d) Connect the starter connector.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
3. PERFORM INITIALIZATION
(a) Perform initialization Testing and Inspection.
NOTICE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.