Installation
2AZ-FE COOLING: RADIATOR: INSTALLATION
INSTALLATION
1. INSTALL FAN SHROUD ASSEMBLY
(a) Attach the 2 pawl fittings of the shroud.
(b) Install the fan assembly with the 2 bolts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
2. INSTALL RADIATOR SUPPORT LOWER
3. INSTALL RADIATOR ASSEMBLY
(a) Install the radiator assembly with the 2 radiator support uppers and 2 bolts.
Torque: 19 Nm (194 kgf-cm, 14 ft-lbf)
(b) Connect the radiator reservoir hose.
(c) Connect the 2 clamps of the engine room main wire.
(d) Connect the 2 cooling fan motor connectors.
4. CONNECT NO. 1 OIL COOLER OUTLET TUBE (for Automatic Transaxle)
5. CONNECT NO. 1 OIL COOLER INLET TUBE (for Automatic Transaxle)
6. CONNECT RADIATOR HOSE OUTLET
7. CONNECT RADIATOR HOSE INLET
8. ADD ENGINE COOLANT Testing and Inspection
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
10. CHECK FOR ENGINE COOLANT LEAKAGE Testing and Inspection
11. PERFORM INITIALIZATION
(a) Perform initialization Testing and Inspection.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
12. INSTALL ENGINE UNDER COVER RH