Cluster Lid C
CLUSTER LID C
Removal and Installation
REMOVAL
1.Remove the CVT shift selector handle (if equipped). CVT Shift Control System.
2.Move shift selector to neutral position, then rotate M/T shift selector knob in a counterclockwise direction to remove from shift selector (if equipped).
3.Release the M/T or CVT finisher, disconnect necessary connectors and remove finisher. Refer to
Component Parts.
4.Release the clips using a suitable tool, disconnect harness connectors, then remove the controller finisher.
5.Remove the cluster lid C upper mask (non SE-R models). Component Parts.
6.Remove the double meter (SE-R models). Removal And Installation.
7.Remove cluster lid C (1).
a.Remove cluster lid C screws (A).
b.Pull out cluster lid C (1) to disconnect harness connector and remove cluster lid C (1).
INSTALLATION
Installation is in the reverse order of removal.
- Be aware of the installation direction, then screw M/T shift selector knob onto shift selector (if equipped).
White arrow indicates : Front