FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Inspection After Installation




CAMSHAFT

Inspection After Installation


Inspection of Camshaft Sprocket (INT) Oil Groove


WARNING:
- Check when engine is cold so as to prevent burns from any splashing engine oil.

CAUTION:
- Perform this inspection only when DTC P0011 is detected in self-diagnostic results of CONSULT and it is directed according to inspection procedure of EC section. IVT Control For California (California), IVT Control For USA And Canada (Except California).
1.Check engine oil level. Removal and Replacement.
2.Perform the following procedure so as to prevent the engine from being unintentionally started while checking.
a.Release fuel pressure. Testing and Inspection (California), Testing and Inspection (Except California).
b.Disconnect ignition coil and injector harness connectors if practical.
3.Support engine using a suitable hoist or jack.
4.Remove the RH engine mounting bracket, mounting insulator and support bracket. Removal and Replacement.
5.Remove IVT control solenoid valve. Removal And Installation.





6.Crank engine, and then make sure that engine oil comes out from IVT control cover oil hole. End cranking after checking.
EM

WARNING:
Be careful not to touch rotating parts (drive belts, idler pulley, and crankshaft pulley, etc.).

CAUTION:
- Engine oil may squirt from IVT control solenoid valve installation hole during cranking. Use a shop cloth to prevent engine oil from splashing on worker, engine components and vehicle.
- Do not allow engine oil to get on rubber components such as drive belts or engine mount insulators. Immediately wipe off any splashed engine oil.
7.Clean oil groove between oil strainer and IVT control solenoid valve if engine oil does not come out from
IVT control cover oil hole. [1][2]Diagrams.
8.Remove components between IVT control solenoid valve and camshaft sprocket (INT), and then check each oil groove for clogging.
- Clean oil groove if necessary. [1][2]Diagrams.
9.After inspection, installation of the remaining components is in the reverse order of removal.