FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Inspection




TRANSVERSE LINK

Inspection


INSPECTION AFTER REMOVAL

Check the following items, and replace the parts if necessary.
Transverse Link
- Transverse link and bushing for deformation, cracks or damage.
- Ball joint boot for cracks or other damage, and also for grease leakage.
Swing Torque
1.Manually move ball stud to confirm it moves smoothly with no binding.
2.Move ball stud at least ten times by hand to check for smooth movement.





3.Hook a spring balance (A) at cutout on ball stud (B). Confirm spring balance measurement value is within specifications when ball stud begins moving.
Swing torque: Refer to "Ball Joint" Ball Joint.


Measurement on : Refer to "Ball Joint" Ball Joint
spring balance
- If swing torque exceeds standard range, replace transverse link assembly.
Axial End Play
1.Move ball stud at least ten times by hand to check for smooth movement.
2.Move tip of ball stud in axial direction to check for looseness.
Axial end play: Refer to "Ball Joint" Ball Joint.
- If axial end play exceeds the standard value, replace transverse link assembly.

INSPECTION AFTER INSTALLATION

Check wheel alignment. Refer to "Inspection" Wheel Alignment Inspection.