Shift Interlock: Testing and Inspection
SHIFT LOCK MECHANISM CHECKSYSTEM CHECK
Inspection Procedure 1-4:
COMPONENTS CHECK
1. Troubleshoot the shift lever.
2. Remove the shift lever assembly. Then, check that there is no damage to each part, and that the shift lever can be moved to each position.
3. After performing the check above, if an abnormality is found, replace the shift lever assembly.