Pinpoint Tests
PINPOINT TEST A: THE CLOCK OPERATION IS ERRATIC/INOPERATIVEA1:
A1-A2:
Normal Operation
The clock receives battery voltage from the smart junction box (SJB) through circuit 483 (RD). Ground for the clock is supplied through circuit 1205 (BK).
Possible Causes
- Circuit 483 (RD) open
- Circuit 1205 (BK) open
- Fuse
- Clock