Test A: The Low Beams Are Inoperative
PINPOINT TEST A: THE LOW BEAMS ARE INOPERATIVEA1-A2:
Normal Operation
The battery junction box (BJB) provides voltage to the smart junction box (SJB) through circuit SBB19 (BU/RD) for the low beam operation.
Possible Causes
- Fuse
- Circuit SBB19 (BU/RD) open
- SJB