Test I: The Puddle Lamps Are Inoperative
PINPOINT TEST I: THE PUDDLE LAMPS ARE INOPERATIVEI1-I3:
I3-I4:
Normal Operation
The smart junction box (SJB) provides voltage to the puddle lamps through circuit CLN26 (BU). The puddle lamps have separate ground circuits. The LH exterior mirror is grounded through circuit GD126 (BK/WH), and the RH exterior mirror is grounded through circuit GD139 (BK/YE).
Possible Causes
- Circuit CLN26 (BU) open
- Circuit GD126 (BK/WH) open
- Circuit GD139 (BK/YE) open
- Exterior mirror