Test E: The Demand Lamps Are Inoperative
PINPOINT TEST E: THE DEMAND LAMPS ARE INOPERATIVEE1-E2:
E2-E3:
Normal Operation
The smart junction box (SJB) supplies voltage to the demand lamps on circuit CLN09 (YE/GN). The demand lamps are grounded through circuit GD139 (BK/YE). The glove compartment lamp (Zephyr only) is case grounded.
Possible Causes
- Circuit CLN09 (YE/GN) open or short to ground
- SJB