Preparation For Test - Section 33
Connection Diagram - Delivery Test:
1. Review section 0. Connection and Use of Test Equipment - Section 0
2. Review Sections: 11, 21, 22, 23, 24, 31, 33.
3. Connect socket box tester to engine control module (N3/10).
Special Tools:
Test equipment:
Description Brand, model, etc.
Digital multimeter Fluke models 23, 77 III, 83, 85, 87
Stop watch Local purchase
Measuring glass (1 liter minimum) Local purchase