Air Conditioning (A/C)
Air Conditioning (A/C)
Models 202 (as of MY 1996)
Pneumatic Test Program [PTP]
Preparation for Test
1. Review 11, 12, 14, 15, 20, 21, 31, 32, 41
2. Disconnect all vacuum lines at vacuum distributor block (36).
3. Check gray vacuum line to intake manifold for leaks.
Note:
Permissible leakage of the elements with vacuum lines at 400 mbar vacuum per minute is 30 mbar.
Special Tools:
Test Equipment:
A. Vacuum Distributor Block, Vacuum Reservoir, Switchover Valve Block (Y11/3) Test
Test Steps 1.0 - 3.0:
B. Vacuum System