Preparation For Test - Section 22
1. Ignition: ON
2. Read out actual values and perform activations using the HHT
3. Ignition: OFF
4. Connect socket box and test cable according to connection diagram (Figure 1 below).
NOTE: Use recommended multimeter (see "Conventional tools, test equipment" below) equipped with an analog bar graph display.
5. After completing repairs on the PTS:
- Erase DTC's
- Wait 20 seconds (the existing fault[s] will be erased after 20 seconds).
NOTE: When replacing the Ultrasonic PTS control module (N62), the control module must be version coded using the HHT. Follow instruction as indicated in the HHT display.
Special Tools:
Conventional tools, test equipment
Description Brand, model, etc.
Multimeter 1) Fluke models 23, 77 III, 83, 85, 87, 88
1) Available through the MBNA Standard Equipment Program.
Figure 1 - Connection Diagram, Socket Box:
NOTE: When testing, use a recommended multimeter (see "Conventional tools, test equipment" above) equipped with an analog bar graph display.