Testing Start of Delivery With Digital Tester (RIV Method)
Testing start of delivery with digital tester (RIV method)Connection diagram of digital tester with adapter (without adapter see Adjusting Start of Delivery W/Digital Tester (RIV Method) After Testing) Adjust Start of Delivery W/Dig. Tester (RIV Method) After Test
Unscrew plug at governor housing (10/6)
Tightening torque 30-35 Nm.
Unscrew RI sensor (017).
Connect Digital tester (001) and pulse generator (021).
Start Engine.
Read off RI value on digital tester at idle speed.
RI specification: 14° ±0.5° ATDC
Adjust start of delivery, it necessary see Adjusting Start of Delivery W/Digital Tester (RIV Method) After Testing) Adjust Start of Delivery W/Dig. Tester (RIV Method) After Test
Perform leak test with engine running
Check engine oil level, adjust to correct level if necessary.
Special tools
Commercially available tools