Wastegate Solenoid: Testing and Inspection
WASTEGATE CONTROL SOLENOID VALVE INSPECTION [MZR 2.3 DISI Turbo]
Airflow Inspection
1. Remove the battery cover. Removal and Replacement
2. Disconnect the negative battery cable. Removal and Replacement
3. Remove the wastegate control solenoid valve. Service and Repair
4. Inspect the airflow between the ports under the following conditions.
Step 1-Step 2:
- If not as specified, replace the wastegate control solenoid valve. Service and Repair