Installation
SUSPENSION: TOE CONTROL LINK: INSTALLATION
HINT
* Use the same procedures for the RH side and LH side.
* The procedures listed below are for the LH side.
* A bolt without a torque specification is shown in the standard bolt chart Standard Bolt - Specified Torque For Standard Bolts.
1. TEMPORARILY INSTALL TOE CONTROL LINK SUB-ASSEMBLY LH
(a) Insert the toe adjust cam from the rear of the vehicle and connect the toe control link. Then temporarily install the No. 2 suspension toe adjust plate with the nut.
NOTICE:
Align the matchmarks of the No. 2 suspension toe adjust plate and suspension member.
(b) Temporarily install the toe control arm with the new nut to the axle carrier.
2. TIGHTEN TOE CONTROL LINK SUB-ASSEMBLY LH
(a) Tighten the 2 nuts.
Torque : 60 Nm (612 kgf-cm, 44 ft-lbf) for suspension member side
Torque : 118 Nm (1203 kgf-cm, 87 ft-lbf) for axle carrier side
3. INSTALL REAR SPEED SENSOR LH Installation
4. INSTALL LOAD SENSING VALVE SENSOR BRACKET Installation
5. STABILIZE SUSPENSION
(a) Stabilize the suspension (w/o Air Suspension) Installation.
(b) Stabilize the suspension (w/ Air Suspension) Installation.
6. INSTALL REAR WHEEL
Torque : 140 Nm (1428 kgf-cm, 104 ft-lbf)
7. CHECK SUSPENSION CONTROL SYSTEM (w/ Air Suspension)
(a) Check the suspension control system Operation Check.
8. INSPECT AND ADJUST REAR WHEEL ALIGNMENT
(a) Inspect and adjust the rear wheel alignment Rear Wheel Alignment.
9. CHECK SPEED SENSOR SIGNAL
(a) Check the speed sensor signal Test Mode Procedure.
10. ADJUST HEADLIGHT ASSEMBLY
(a) Adjust the headlight Adjustments.