Installation
1UR-FSE COOLING: THERMOSTAT: INSTALLATION
1. INSTALL WATER INLET SUB-ASSEMBLY WITH THERMOSTAT
(a) Install a new gasket and the water inlet with thermostat with the 3 nuts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
2. CONNECT NO. 2 RADIATOR HOSE
HINT
The direction of the hose clamp is indicated in the illustration.
3. INSTALL RADIATOR RESERVOIR ASSEMBLY
(a) Install the radiator reservoir with the 2 bolts.
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
(b) Connect the 2 reservoir hoses.
HINT
The direction of the hose clamp is indicated in the illustration.
4. ADD ENGINE COOLANT Service and Repair
5. INSTALL NO. 1 AIR CLEANER INLET Installation
6. INSPECT FOR COOLANT LEAK Component Tests and General Diagnostics
7. INSTALL ENGINE ROOM SIDE COVER RH Installation
8. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY Installation
9. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
10. INSTALL NO. 1 ENGINE UNDER COVER Service and Repair