Removal
4GR-FSE INTAKE / EXHAUST: INTAKE MANIFOLD: REMOVAL
1. REMOVE COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY
(a) Remove the cowl top ventilator louver sub-assembly Removal.
2. REMOVE V-BANK COVER SUB-ASSEMBLY Removal
3. DRAIN ENGINE COOLANT Service and Repair
4. REMOVE AIR CLEANER CAP WITH AIR CLEANER HOSE Removal
5. REMOVE THROTTLE BODY Removal
6. REMOVE INTAKE AIR SURGE TANK ASSEMBLY
(a) Disconnect the cold start injector connector.
(b) Separate the 2 bolts and cold start injector.
(c) Disconnect the connector and 2 fuel vapor feed hoses.
(d) Remove the bolt and No. 1 vacuum switching valve assembly.
(e) Disconnect the connector, union to check valve hose, water by-pass hose and 3 wire harness clamps.
(f) Disconnect the ventilation hose.
(g) Remove the bolt and water hose joint.
(h) Remove the bolt and separate the surge tank stay from the intake air surge tank assembly.
(i) Remove the 2 nuts and bolt from the intake air surge tank assembly.
(j) Using a 5 mm socket hexagon wrench, remove the 6 bolts.
(k) Remove the intake air surge tank assembly and 3 gaskets.
7. REMOVE INTAKE MANIFOLD
(a) Remove the 4 bolts, 4 nuts, intake manifold and 2 gaskets.