Installation
A760H AUTOMATIC TRANSMISSION: SHIFT LEVER ASSEMBLY: INSTALLATION
1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
(a) Install the floor shift assembly with the 4 bolts.
Torque : 8.3 Nm (85 kgf-cm, 73 in-lbf)
(b) Connect the connector to the floor shift assembly.
2. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
(a) Turn the control shaft lever of the park/neutral position switch counterclockwise until it stops, and turn it clockwise 2 notches to set it to the N position.
(b) Move the shift lever to the N position and tighten the nut while lightly pushing the lever toward the R position.
Torque : 13 Nm (130 kgf-cm, 9 ft-lbf)
NOTICE:
Do not push the shift lever too hard.
3. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR (for 4GR-FSE) Installation
4. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR (for 2GR-FSE) Installation
5. INSTALL FRONT EXHAUST PIPE ASSEMBLY
for 4GR-FSE: Installation
for 2GR-FSE: Installation
6. INSTALL NO. 2 CONSOLE BOX DUCT Installation
7. INSTALL CONSOLE BOX Installation
8. INSTALL CONSOLE BOX REGISTER ASSEMBLY (w/ Ashtray) Installation
9. INSTALL CONSOLE BOX REGISTER ASSEMBLY (w/o Ashtray) Installation
10. INSTALL FRONT ASH RECEPTACLE BOX SUB-ASSEMBLY (w/ Ashtray) Installation
11. INSTALL INSTRUMENT PANEL BOX ASSEMBLY (w/o Ashtray) Installation
12. INSTALL CONSOLE PANEL SUB-ASSEMBLY Installation
13. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH Installation
14. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH Installation
15. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY Installation
16. INSPECT SHIFT LEVER POSITION Initial Inspection and Diagnostic Overview
17. ADJUST SHIFT LEVER POSITION Adjustments
18. INSPECT FOR EXHAUST GAS LEAK (for 4GR-FSE) Installation
19. INSPECT FOR EXHAUST GAS LEAK (for 2GR-FSE) Installation