Installation
A960E AUTOMATIC TRANSMISSION: SHIFT LEVER ASSEMBLY: INSTALLATION
1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
(a) Install the floor shift assembly with the 4 bolts.
Torque : 8.3 Nm (85 kgf-cm, 73 in-lbf)
(b) Connect the connector to the floor shift assembly.
2. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
(a) Install the floor shift gear shifting rod sub-assembly with the nut.
Torque : 13 Nm (133 kgf-cm, 9 ft-lbf)
3. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR Installation
4. INSTALL FRONT EXHAUST PIPE ASSEMBLY Installation
5. INSTALL OXYGEN SENSOR Installation
6. INSTALL FRONT CENTER FLOOR BRACE Installation
7. INSTALL REAR NO. 1 FLOOR PANEL BRACE Installation
8. INSTALL NO. 2 FLOOR UNDER COVER Installation
9. INSTALL NO. 1 FLOOR UNDER COVER Installation
10. INSTALL NO. 2 CONSOLE BOX DUCT Installation
11. INSTALL CONSOLE BOX Installation
12. INSTALL CONSOLE BOX REGISTER ASSEMBLY (w/ Ashtray) Installation
13. INSTALL CONSOLE BOX REGISTER ASSEMBLY (w/o Ashtray) Installation
14. INSTALL FRONT ASH RECEPTACLE BOX SUB-ASSEMBLY (w/ Ashtray) Installation
15. INSTALL INSTRUMENT PANEL BOX ASSEMBLY (w/o Ashtray) Installation
16. INSTALL CONSOLE PANEL SUB-ASSEMBLY Installation
17. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH Installation
18. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH Installation
19. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
20. ADJUST SHIFT LEVER POSITION Adjustments
21. INSPECT SHIFT LEVER POSITION Shift Lever Assembly
22. INSPECT FOR EXHAUST GAS LEAK Installation