Installation
1UR-FSE ENGINE CONTROL SYSTEM: THROTTLE BODY: INSTALLATION
1. INSTALL THROTTLE BODY
(a) Install a new gasket to the intake manifold.
(b) Connect the No. 4 water by-pass hose and No. 5 water by-pass hose to the throttle body.
NOTICE:
Position the claws of the clamps as shown in the illustration.
(c) Install the throttle body with the 4 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(d) Connect the throttle motor connector.
2. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
3. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
4. INSTALL NO. 1 AIR CLEANER INLET Installation
5. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
6. INSTALL ENGINE ROOM SIDE COVER RH Installation
7. INSTALL ENGINE ROOM SIDE COVER LH Installation
8. INSTALL COOL AIR INTAKE DUCT SEAL Installation
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
10. ADD ENGINE COOLANT Service and Repair
11. INSPECT FOR ENGINE COOLANT LEAK Testing and Inspection
12. INSTALL ENGINE UNDER COVER REAR RH
13. INSTALL ENGINE UNDER COVER REAR LH
14. INSTALL ENGINE UNDER COVER