Canister Purge Solenoid: Testing and Inspection
1UR-FSE EMISSION CONTROL: PURGE VALVE: INSPECTION
1. INSPECT VACUUM SWITCHING VALVE ASSEMBLY
(a) Measure the resistance according to the value(s) in the table below.
Standard resistance:
If the result is not as specified, replace the vacuum switching valve assembly.
(b) Check operation of the vacuum switching valve assembly.
(1) Check that air does not flow from port E to port F.
(2) Apply battery voltage across terminals 1 and 2.
(3) Check that air flows from port E to port F.
If the result is not as specified, replace the vacuum switching valve assembly.