Installation
1UR-FSE COOLING: THERMOSTAT: INSTALLATION
1. INSTALL WATER INLET SUB-ASSEMBLY WITH THERMOSTAT
(a) Install a new gasket and the water inlet sub-assembly with thermostat with the 3 nuts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
2. CONNECT NO. 2 RADIATOR HOSE Installation
3. ADD ENGINE COOLANT Service and Repair
4. INSPECT FOR COOLANT LEAK Testing and Inspection
5. INSTALL NO. 1 AIR CLEANER INLET Installation
6. INSTALL COOL AIR INTAKE DUCT SEAL Installation
7. INSTALL ENGINE UNDER COVER