Installation
2ZR-FXE EMISSION CONTROL: EGR COOLER: INSTALLATION
1. INSTALL EGR COOLER SUB-ASSEMBLY
(a) Temporarily install a new gasket and the EGR cooler sub-assembly with the 2 nuts (A).
Text in Illustration
(b) Install 2 new gaskets and set the EGR valve with cooler assembly in place.
(c) Using an E8 "TORX" socket wrench, install the 4 stud bolts.
Stud Bolt (B) - Torque : 9.5 Nm (97 kgf-cm, 84 in-lbf)
Stud Bolt (C) - Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
(d) Temporarily install the 4 nuts (B and C) and bolt.
(e) Tighten the 2 nuts (A).
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(f) Tighten the 2 nuts (B) and bolt.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
NOTICE:
Make sure that all installation surfaces of the EGR valve with cooler assembly are in even contact when tightening the bolts and nuts.
(g) Tighten the 2 nuts (C).
Type A - Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
Type B - Torque : 37 Nm (377 kgf-cm, 27 ft-lbf)
(h) Connect the connector, wire harness clamp and 4 water hoses.
2. INSTALL EGR PIPE ASSEMBLY Installation
3. INSTALL AIR CLEANER CASE Installation
4. INSTALL INLET AIR CLEANER ASSEMBLY Installation
5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
6. INSTALL NO. 2 CYLINDER HEAD COVER Installation
7. ADD COOLANT (for Engine) Service and Repair
8. INSPECT FOR COOLANT LEAK (for Engine) Testing and Inspection
9. INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY Installation
10. INSTALL COWL BODY MOUNTING REINFORCEMENT LH Installation
11. INSTALL NO. 2 HEATER AIR DUCT SPLASH SHIELD SEAL Installation
12. INSTALL NO. 1 HEATER AIR DUCT SPLASH SHIELD SEAL Installation
13. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY
Installation